Northrop Grumman Approved Special Processors Listings - Supplier Report
Applied Composite Technology Aerospace dba ACT Aerospace: 90044639 - Independent Processor - NADCAP Approved
425 E 400 N
Gunnison, UT 84634 United States
Phone: 435-528-7199    Fax:
Selected sector: AS

Specification Process Description Category Limits
ACS-PRS-2151 Process Specification for Sealing, Integral Fuel Tank and Fuel Cell Cavity Finishes/Coatings Limits: Limits: Type II Faying Surface/ Seam and Joint Fillet Sealing Only. Not Approved or Appendix A (Ref: RC/I R432667 defines Qualification requirements)
ACS-PRS-2201 Surface Preparation for Structural Adhesive Bonding Chemical Processing Limits: Limited to Type I, Class A only
ACS-PRS-2201.01 Surface Preparation for Structural Adhesive Bonding, Composites Composites Limits: Limited to producing Epoxy parts. Ref. RCI 445148
ACS-PRS-5001 Curing Procedures for Composite Laminates and Sandwich Assemblies Composites Limits: Not approved for Appendix A
ACS-PRS-5017 Process Specification Fabrication of Out-of-Autoclave, 350°F Cure, Epoxy Laminates Composites Limits: Limits: None NGAS M&P (B. Marino) confirmed that all room temperature qualification testing has been completed.
ACS-PRS-5053 Machining of Nonmetallic Honeycomb Details Composites Limits: Not approved for Application of Removable Stabilization Material for Machining (Ref: para. 3.3.5.2) Not approved for Appendix A
ACS-PRS-5065 Process Specification for Fabrication Of 350°F Curing Out-Of-Autoclave Epoxy Composite Structure, Bonded, Cocured, Or Cobonded Composites Limits: Limits: None NGAS M&P (B. Marino) confirmed that all room temperature qualification testing has been completed Ref RC/I’s R429930, R431982
ACS-PRS-5065.01 Process Specification for Fabrication of Secondarily Bonded Structure Using Low Vacuum Composites Limits: None
ACS-PRS-5065.02 Installing Inserts, Hardpoints, and Edge Filler in Composite Sandwich Structure Composites Limits: None
ACS-PRS-6002 Hole Preparation, Drilling, Mach.,Trimming for Composite/Metallic Structure Composites Limits: Not approved for Appendix A,B & C
ACS-PRS-6002.01 Process Specification for Contamination Free Hole Preparation, Drilling, Machining and Trimming of Composites and Composite/Metallic Structures Composites Limits: None
ACS-PRS-7001 Ultrasonic Inspection of Composites and Bonded Assemblies Non-Destructive Testing Limits: Not approved for Appendix A & B
ACS-PRS-7101 Non-Destructive Inspection of Composite Structures Non-Destructive Testing Limits: None
ACS-PRS-8002 Area Requirements for Composite Fabrication Composites Limits: Limits: Limited to Areas; C, D and E only Not Approved for Appendix A & B